[Opera-CONNIE] To-do list for next trip

Alejandro Castañeda ale.cas.vaz at gmail.com
Tue Jan 20 18:10:42 BRST 2015


Hello all,

Ok we will count the number of lead bricks.

We have one question:

We're going to take out the system as well as we leave it last time on the
bench,  aren't we? I mean, we don't need take with us additional
components, right?

Cheers.

Alejandro Castañeda.
El 20/01/2015 16:44, "Martin Makler" <martinmakler at gmail.com> escribió:

> Hi all.
>
> So that we avoid loosing information on what has to be done on each trip
> due to many emails, I've put a to do list on CONNIE's wiki.
>
> The link is http://icra.cbpf.br/twiki/bin/view/CONNIE/ContainerToDoList
>
> In this way, each time a new item appears for the to do list, either on a
> telecon or e-mail exchange, it can simply be added to the wiki, which would
> be *the ultimate repository of such kind of information*.
>
> For next trip I have compiled what I heard on the discussions on the
> telecon, what I discussed with Alejandro and Pamela, and what was
> circulated by e-mail.
> Please feel free to edit this list (link above).
> Please let me know if you don't have access to the wiki yet.
>
> I am also reproducing the current list below:
>
> To-do list for the trip planned for Jan 22, 2014
>
> Before the trip:
>
>         • Provide the transportation using CBPF's car+driver
>         • Authorization to enter with new HD for Cyclone (this one will be
> used to back up the system)
>         • Authorization to take out old Cyclone HD (so that we use the
> controller to try to recover the damaged disk)
>         • Authorization to take out the vacuum station
>         • Purchase cover for the crates outside the container
>         • Borrow (with Alexandre Mello?) covers for the vacuum station and
> the pipes
> At the power plant:
>
>         • Fix the new camera installation
>         • Put new wraps/cover on crates outside the container
>         • Cover the open pipe and the vacuum station
>         • Count the unused lead bricks in the container (pile next to the
> lsd machine)
>         • Remove one of the 4 identical HD on Cyclone (check with
> Guillermo (?) which HD to disconnect) and take it to CBPF. Take pictures of
> all the connections so that the HD is put back in the very same position
>         • Install new HD on cyclone
>         • Get the vacuum station, condition for transportation, and take
> to CBPF.
>
> Cheers.
>
> Martin.
>
>
>
> On Jan 20, 2015, at 2:25 PM, Guillermo Fernandez <
> fmoroni.guillermo at gmail.com> wrote:
>
> > Hello Alejandro and Pamela,
> >
> > can you count the number of lead bricks that are in the container and
> not being used for the shield, in your next visit. The pile next to the lsd
> machine. I cannot find that number in my notebook.
> > Let's also try to solve the problems with the cameras. The one that we
> had connected has not been working at all since last week. In fact, it
> looks disconnected from the dlink server.
> >
> > Thanks a lot.
> >
> >
> > Guillermo
> > _______________________________________________
> > Opera-CONNIE mailing list
> > Opera-CONNIE at listas.if.ufrj.br
> > http://listas.if.ufrj.br/listinfo/opera-connie
>
> _______________________________________________
> Opera-CONNIE mailing list
> Opera-CONNIE at listas.if.ufrj.br
> http://listas.if.ufrj.br/listinfo/opera-connie
>
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://listas.if.ufrj.br/pipermail/opera-connie/attachments/20150120/eed764d7/attachment.html>


More information about the Opera-CONNIE mailing list